Kitchen remodeling, bathroom remodeling, home additions, garage conversions, ADU construction and whole-home renovations — permitted, scheduled and finished by one licensed crew.
Each service below has its own page with scope, real cost ranges, timelines and the questions homeowners actually ask.
Custom cabinetry, counters, islands and full layout changes, including moving plumbing and electrical where the layout calls for it.
Tub-to-shower conversions, primary suites, guest baths and waterproofing done properly, not just prettily.
Room additions, second storeys and bump-outs — engineered and framed to match the existing house instead of looking bolted on.
Turn an under-used garage into a legal bedroom, office, gym or income-producing studio — permitted, insulated and finished.
Detached, attached and junior ADUs — design, permits and build, whether it is for rental income or family.
Full-house renovations — systems, structure and finishes handled under one contract and one schedule.
Remodels rarely go sideways over tile choices. They go sideways over permits nobody pulled, trades nobody scheduled and change orders nobody priced in writing.
Structural, plumbing, gas and electrical work is permitted and inspected. You are not left holding unpermitted work at resale.
You see the allowance for every category before demolition, and every change is priced and signed before we proceed.
We sequence the trades. You get one person to call and a schedule you can plan around.
Fifteen years with the building departments in the cities we serve. We know what each one asks for before they ask.
We walk the space with you, measure, and talk honestly about what is realistic at your budget.
Line-item, with an allowance per category, so you know what is and is not included.
Drawings finalised, engineering where needed, permit submitted and tracked through plan check.
Containment up, trades sequenced, weekly updates, inspections scheduled as each phase closes.
We walk the job with you and clear the list before the final invoice, not after.
Workmanship warranty in writing, plus the manufacturer warranties on everything installed.
Kitchens, bathrooms, ADUs, garage conversions and additions across the East Bay and North Bay.
Wall removed between kitchen and dining, new island, walnut counters and a full panel upgrade.
Tub removed, frameless glass enclosure, full-height stone tile and a heated floor.
Two-bedroom detached unit with its own utilities, permitted under California ADU law.
New upper floor with a primary suite, matched siding profile and rebuilt roofline.
Floor raised and insulated, garage door replaced with a window wall, mini-split fitted.
Full re-pipe and re-wire, rebuilt front porch, new windows and every interior surface.
California contractor licence CSLB #959458. Every project is permitted and built under our own licence, not a subcontractor’s.
You see what each part of the job costs before any work starts. If the scope changes, the change is priced and agreed in writing first.
We pull the permits, book the inspections and hand over a written workmanship warranty with the permit sign-offs at completion.
Ten cities across the East Bay and North Bay. We keep the area tight on purpose — knowing the housing stock and the building department is worth more than covering a wider map badly.
The East Bay and North Bay: Berkeley, Oakland Hills, El Cerrito, Hercules, Concord, Pleasant Hill, Antioch, Benicia, Hayward and San Rafael.
Yes. We hold California CSLB licence #959458 and carry general liability insurance and workers’ compensation. You can verify the licence yourself at cslb.ca.gov.
Yes. We visit the site, measure, and send a written line-item estimate at no cost and with no obligation.
A bathroom typically runs $28,000–$45,000, a kitchen $55,000–$180,000, an addition $130,000–$280,000 and a detached ADU $250,000 and up. Each service page has a full cost breakdown.
Yes, under our own licence, and we schedule the inspections. You are not the one calling the building department.
Three to six weeks for a bathroom, six to twelve for a kitchen, four to eight months for an addition and five to eight months on site for an ADU — plus design and permit time before that.
Send the details and we will come out, measure, and give you a written line-item estimate. No obligation, no pressure, no sales visit dressed up as a consultation.
Fields marked * are required. We reply within one business day.
We respond within one business day · No obligation · No pressure